Calculate cubic yards of excavation, total cost, haul-away loads, and truck trips for any digging project, pools, foundations, basements, drainage, and site grading.
ft
ft
ft
0 = vertical walls; 1 = 1:1 slope adds depth ร 1 ft to each side
ft
ft
ft
ft
Working room around pool shell: typically 2 ft
ft
ft
ft
Maximum depth removed at the high end
ft
Fill = dirt needed to raise the low end (not hauled away)
ft
$5โ$15 typical; $50โ$200 for rock
$
$
YOUR RESULTS
Bank Volume
โ
cu yd (in ground)
Loose Volume
โ
cu yd (trucked)
Truck Loads
โ
loads
Weight
โ
tons (approx)
Dig Cost
โ
est.
Haul-Away Cost
โ
est.
Total Estimate
โ
est.
โ ๏ธ Call 811 before digging, underground utilities must be marked 2โ3 business days in advance. Cost estimates use national averages. Rocky soil, limited access, or deep excavations can increase costs 2โ5ร. Always get 3 quotes from licensed excavation contractors.
Choose your excavation shape: rectangular (foundations, basements, trenches), pool (with shallow-to-deep grading and working clearance), or slope/grading (cut-and-fill site work). Enter your soil type to apply the correct swell factor, then add your cost rates for a complete estimate. Bank volume is what's in the ground; loose volume is what gets trucked. Always use loose volume for haul-away pricing.
How to Calculate Excavation Volume
Bank volume = length ร width ร depth รท 27 (cubic feet to cubic yards). This is the in-ground volume. When soil is excavated it expands: this is called swell. The loose volume (what actually goes into the trucks) is always larger than the bank volume. Use bank volume for excavation pricing; use loose volume for haul-away and truck count estimates.
Worked example: a 30ร20 ft foundation excavation, 4 ft deep, vertical walls, average loam (25% swell). Bank volume = 30 ร 20 ร 4 รท 27 = 88.9 cu yd. Loose volume = 88.9 ร 1.25 = 111.1 cu yd. At a 14 cu yd truck: 8 truck loads. At $8/cu yd dig + $12/cu yd haul: dig cost = $711, haul cost = $1,333, total โ $2,044. Add a contingency for rock if uncertain about subsurface conditions.
Soil Type and Swell Factor Reference
Soil Type
Swell Factor
Weight (bank cu yd)
Digging Difficulty
Loose / sandy soil
1.20 (20%)
~2,400โ2,700 lbs
Easy, hand-dig possible
Average loam / topsoil
1.25 (25%)
~2,700โ3,000 lbs
Moderate, standard equipment
Dense clay
1.30 (30%)
~3,000โ3,400 lbs
Hard, may need hydraulic breaker
Hardpan / caliche
1.40 (40%)
~3,200โ3,800 lbs
Very hard, blasting sometimes required
Shattered rock
1.50 (50%)
~4,000โ5,000 lbs
Extremely hard, 5โ10ร cost premium
Excavation Cost Reference
Project Type
Dig Cost (per bank cu yd)
Haul-Away (per loose cu yd)
Typical Total Range
Standard soil, good access
$5โ$15
$8โ$20
$13โ$35 per cu yd all-in
Clay / difficult soil
$15โ$35
$10โ$25
$25โ$60 per cu yd all-in
Rock excavation
$50โ$200+
$20โ$40
$70โ$250+ per cu yd all-in
Pool excavation (avg)
$1,500โ$5,000
Included or separate
Flat bid; get 3 quotes
Basement (full)
$10,000โ$30,000
Often included
Varies enormously by depth/soil
Foundation footings only
$500โ$3,000
Often included
Usually flat bid
Choosing the Right Equipment
Equipment choice affects both cost and how much of a footprint the job leaves behind. Contractors size equipment to the job rather than always using the biggest machine available:
Equipment
Typical Use
Bucket/Capacity
Mini excavator (1 to 4 ton)
Tight-access yards, utility trenches, small footings
0.5 to 6 cu ft bucket
Standard excavator (8 to 20 ton)
Foundations, basements, pools
1 to 3 cu yd bucket
Skid steer
Grading, backfill spreading, material moving
0.5 to 1 cu yd bucket
Backhoe loader
Utility trenches, small-to-mid excavation
0.5 to 1.5 cu yd bucket
Bulldozer
Large-area grading, land clearing
Blade width, not bucket-rated
Tight side-yard or backyard access is one of the most common reasons a bid comes in higher than expected: a standard excavator that can't fit through a gate forces the contractor to use a smaller mini excavator and haul spoil by hand or wheelbarrow to a truck, which adds significant labor time. If your access is narrow, mention it when requesting quotes so the bid reflects the actual equipment needed.
Bank vs. Loose vs. Compacted Measure
Every excavation project deals with three volume states: bank measure (soil in the ground; used for contract pricing), loose measure (soil after it's dug; expands due to air voids and is used for truck count and haul-away pricing), and compacted measure (soil after re-compaction; shrinks below even bank volume and is used when calculating backfill). This calculator handles bank and loose volumes automatically. If you need to backfill, assume compacted volume is 80โ90% of the bank volume.
The diagram below shows how the same soil takes up different amounts of space at each stage.
Bank volume is what you're billed for digging. Loose volume, the swelled state, is what gets trucked away.
Common Excavation Mistakes
Not calling 811 before digging. Underground utilities (gas lines, electrical conduits, water mains, fiber) must be marked before any mechanical excavation. Call 811 at least 2โ3 business days in advance in the US. Striking a gas line can be fatal; striking electrical conduit causes fires and serious electrocution risk. This is not optional: it's the law in every US state.
Confusing bank yards with loose yards for haul-away pricing. Contractors bid excavation in bank yards; hauling is priced in loose yards. If you receive a quote of "$15 per yard" without specifying bank or loose, clarify immediately. At a 25% swell factor, a 100 bank-yard job generates 125 loose yards for hauling: a significant cost difference.
Not budgeting for rock contingency. You cannot reliably predict subsurface conditions without a geotechnical report. Any excavation over 4 ft deep, or in an area with rocky terrain, should include a rock contingency of 20โ50% of the excavation budget. Rock clauses are standard in excavation contracts for this reason; make sure yours includes one.
Underestimating the footprint for sloped excavations. Trenches and foundations in sandy or unstable soil require sloped walls (OSHA requires specific slope ratios for trench safety). A 4 ft deep trench with a 1:1 slope adds 4 ft to each side, turning a 3 ft wide trench into an 11 ft wide excavation at the top. This dramatically increases volume and haul-away cost.
Forgetting where the dirt goes. Before excavating, you need a plan for the spoil. Some soil can be stockpiled on-site for backfill; excess must be trucked away. Trucking costs and tipping fees are often 30โ60% of the total excavation cost. Confirm with your contractor whether haul-away is included in the bid or is a separate line item priced per truck load.
Contractor tip: Always get at least 3 competitive bids for any excavation job over $2,000. Ask each contractor what happens if they hit rock: is it a fixed per-yard rock rate or a time-and-materials charge? Also ask whether the haul-away destination is a licensed fill site (required for clay and contaminated soil) or a private property disposal. Unlicensed disposal creates liability that can follow the property owner for years.
Standard soil excavation runs $5 to $15 per bank cubic yard in most US markets (2026), not including haul-away. Clay and difficult soil runs $15โ$35 per yard. Rock excavation is $50โ$200+ per yard. Haul-away (trucking + landfill fees) adds $8โ$25 per loose cubic yard. Minimum charges are typically $500โ$1,500 even for small projects. Prices vary enormously by region, always get at least 3 quotes from licensed excavation contractors.
How many cubic yards does a dump truck hold? โพ
A standard single-axle dump truck holds 10โ14 cubic yards of loose soil. A tandem-axle dump truck holds 14โ16 yards. Semi end-dumps hold 18โ22 yards. Contractors count truck loads to estimate haul-away costs: divide your loose volume by truck capacity and round up. For a 30ร20ร4 ft foundation with average loam: 111 loose cu yd รท 14 cu yd per truck = 8 truck loads.
Do I need a permit for excavation? โพ
Yes, for most structural excavation: pool excavation, basement digging, foundation work, and any trench over 5 feet deep require permits in most jurisdictions. Trenches over 5 ft also require OSHA-compliant shoring or sloping, which dramatically increases the footprint (and volume) of the excavation. Always call 811 at least 2โ3 business days before digging to have underground utilities marked. Striking a gas or electrical line during excavation can be fatal and results in major liability.
What is soil swell and why does it matter? โพ
Soil swell is the volume increase that occurs when soil is excavated and broken up. Compacted soil in the ground contains minimal air voids; once dug, the particles don't compact back together and the volume expands 15โ50% depending on soil type. This matters because: (1) you'll need more trucks than the bank volume suggests, and (2) haul-away is typically priced per loose yard. A 100 bank-yard job generates 125 loose yards of average soil: 8 to 9 truck loads at 14 yards per truck, not 7.
How much excavation does a pool require? โพ
A typical 32ร16 ft pool with a 3.5 ft shallow end and 8 ft deep end requires roughly 175 to 190 bank cubic yards of excavation, including 2 ft of working clearance around the shell and 1 ft of working room below the shell. At 25% swell, that's roughly 220 to 240 loose cubic yards, about 16 to 17 truck loads at 14 cu yd per truck. Pool excavation typically costs $1,500 to $5,000 as a flat bid; rock-heavy sites can cost significantly more. The pool contractor's quote usually includes excavation, confirm this before signing the contract.